ADVERTISEMENT FOR BIDS



Nashville Office

Jackson Office

Maryville Office

Awarded Contracts

BIDS FROM THE NASHVILLE OFFICE

 

Town of Livingston, Tennessee:  Water System Improvements
JRWCO Job No. 1907

Bid Date:  Tuesday, April 29, 2008
Bid Time:  2:00 P.M. CDT

Mandatory Pre-Bid Conference:  Thursday, April 24, 2008 @10:00 A.M. CDT

CONTRACT 2008-01 - Water Treatment Plant Site Piping, SCADA System and Hilham Booster Station Expansion

  • SCADA System to control and monitor Cumberland River raw water intake (under construction), four existing booster stations and tanks, and to monitor three existing tanks, the raw water intake and the raw water surge tank
  • Construct a valve pit and raw water piping at the Water Treatment Plant
  • Expand the Hilham Booster Station
  • 270+/- L.F. of 20-inch Class 250 DIP water line
  • 730+/- L.F. of 16-inch Class 250 DIP water line

Project Manager: Melissa L. Boner 

Bid Advertisement  
Planholders 
 
Addendum No. 1
  
Addendum No. 2
  
Bid Results


Hopkinsville Water Environment Authority - Hopkinsville, Kentucky:  Water System Improvements
JRWCO Job No. 1844

Bid Date: Thursday, February 7, 2008
Bid Time:  2:00 P.M., Local Time

Pre-Bid Conference:  Tuesday, January 29, 2008 @ 10:00 A.M., Local Time

HWEA CONTRACT NO. 109-2008-01 - Painting 2,000,000-Gallon Industrial Park Elevated Water Storage Tank and 75,000-Gallon Pembroke Elevated Water Storage Tank

  • 2,000,000-Gallon Industrial Park Fluted Column Elevated Water Storage Tank

    Cleaning tank exterior using blast cleaning methods and recoating the tank exterior
    Cleaning tank wet interior using blast cleaning methods and recoating the tank wet interior
    Cleaning the tank dry interior using pressure washing and abrasive hand tool cleaning methods and recoating damaged areas
    Miscellaneous repairs


  • 75,000-Gallon Pembroke Elevated Water Storage Tank

    Cleaning tank exterior using blast cleaning methods and recoating the tank exterior
    Miscellaneous repairs

Project Manager: J. Greg Davenport, P.E.

Bid Advertisement  
Plan Holders
  
Addendum No. 1

Bid Results - under consideration by Owner


Town of Livingston, Tennessee:  New Water Source - Cumberland River
JRWCO Job No. 1831

Financing by USDA Rural Development

Bid Date:  Tuesday, January 29, 2008
Bid Time:  2:00 P.M., CST

CONTRACT 2007-04 - Raw Water Transmission Line, Hilham Surge Tank to Masters Lane at Campground Road

  • Approximately 25,800 L.F. 20-Inch Water Line (Alternate Materials are D.I.P. or C905 PVC pipe)
  • Highway Bores under S.R. 85 and S.R. 136
  • Twelve Air Valves
  • Three Blowoffs

CONTRACT 2007-05 - Raw Water Transmission Line, Masters Lane at Campground Road to Water Treatment Plant

  • Approximately 24,533 L.F. 20-Inch Water Line (Alternate Materials are D.I.P. or C905 PVC pipe)
  • Highway Bores under S.R. 111 and Old S.R. 42
  • Road Bore Under Windle Road
  • Twenty Air Valves
  • Two Blowoffs

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement  
Plan Holders
   
Bid Results


Town of Livingston, Tennessee:  New Water Source - Cumberland River
JRWCO Job No. 1831

Financing by USDA Rural Development

Bid Date:  Thursday, November 15, 2007
Bid Time:  2:00 P.M., CST

CONTRACT 2007-06 - Open Top Raw Water Surge Tank and Site Work

  • This project consists of a 32-feet diameter x 56-feet tall open top welded steel ground level raw water surge tank together with the site work and approximately 385 L.F. of 16-inch Class 250 Ductile Iron Pipe, a 12-inch Drain Line, three 16-inch Butterfly Valves, one 12-inch Gate Valve and all other work shown on the Plans or specified in the Detailed Specifications.

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement
Plan Holders  
Addendum No. 1
  
Bid Results


Town of Livingston, Tennessee:  New Water Source - Cumberland River
JRWCO Job No. 1831

Financing by USDA Rural Development

Bid Date:  Thursday, November 15, 2007
Bid Time:  2:00 P.M., CST

CONTRACT 2007-03 - Raw Water Transmission Line, Station 210+00 Near Dry Mill Creek Road to Hilham Surge Tank

  • Approximately 19,878 L.F. 20-inch Class 350 Ductile Iron Pipe
  • Approximately 1,513 L.F. of Restrained Joint 20-inch Class 350 Ductile Iron Pipe laid on slopes (greater than 20 percent)
  • Approximately 1,562 L.F. 20-inch Class 300 Ductile Iron Pipe
  • Approximately 4,770 L.F. 20-inch Class 250 Ductile Iron Pipe
  • Approximately 370 L.F. 20-inch Class 250 Ductile Iron Pipe laid on slopes greater than 20 percent
  • Two Special Creek Crossings
  • All other work as shown on the Plans or specified in the Detailed Specifications

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement
Plan Holders  
Addendum No. 1
  
Bid Results


Lewisburg, Tennessee:  Sewer System Rehabilitation
JRWCO Job No. 1863

Bid Date: Tuesday, August 14, 2007
Bid Time:  2:00 P.M., Local Time

CONTRACT 2007-01 - Sewer System Rehabilitation

  • Renovation of approximately 5,157 L. F. of 6- and 8-inch gravity sewer line with new 8-inch HDPE pipe using pipe bursting methods
  • Renovation of approximately 75 L. F. of 6-inch gravity sewer line with new 8-inch pipe using open cut methods
  • 28 manhole replacements
  • 84 sewer connections and associated sewer service pipe from the mainline connection to the customer's property line or easement line including the installation of new clean outs at the easement or property line

Project Manager:   J. Greg Davenport, P.E.

Bid Advertisement 
Plan Holders    
Addendum No. 1  
Bid Results


Smith Utility District:  Water System Improvements
JRWCO Job No. 1881

Bid Date: Thursday, July 19, 2007
Bid Time:  2:00 P.M., CDT

CONTRACT 2007-01 - Water Treatment Plant Improvements

  • Modifications to the Process Wastes Treatment System
  • Install new electrically operated butterfly valves, new underdrains and air scour system in six filters
  • New SCADA System
  • Install two new backwash pumps
  • Make changes in the backwash piping system
  • Roof Replacement
  • Add a floor to the building
  • Add a chemical storage tank
  • Two Standby Generators
  • Replace top baffle in three basins
  • Electrical work
  • Paint the entire facility

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement 
Plan Holders 
Addendum No. 1 
Addendum No. 2 
Addendum No. 3   
Bid Results


Lewis County, Tennessee:  Water System Improvements
JRWCO Job No. 1864

CDBG Project No.GG-07-20485-00

Bid Date: Thursday, June 14, 2007
Bid Time:  2:00 P.M., CDT

CONTRACT 2007-01 - Highway 20 Water System Extension

  • Approximately 12,758 L.F. of 6-inch Water Line
  • Approximately 13,370 L.F. of 4-inch Water Line
  • Approximately 4,482 L.F. of 3-inch Water Line
  • Approximately 2,985 L.F. of 2-inch Water Line
  • Deductive Alternative will be applied to reduce the project to meet the available funds if necessary

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement 
Plan Holders 

Addendum No. 1 
Bid Results


Town of Livingston, Tennessee:  Water System Improvements
JRWCO Job No. 1830

Bid Date: Thursday, May 24, 2007
Bid Time:  2:00 P.M., CDT

CONTRACT 2006-01 - Raw Water Intake

  • Cumberland River Intake Structure
  • Traveling Water Screen
  • 500 HP Raw Water Pump
  • 700 HP Raw Water Pump
  • Ball Check Valves with an Oil Accumulator System
  • Surge Anticipator and Surge Relief Valves

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement 
Plan Holders 

Addendum No. 1 

Bid Results


City of Columbia, Tennessee:  Sewer System Improvements
JRWCO Job No. 1871

Bid Date: Tuesday, May 22, 2007
Bid Time:  10:30 A.M., Local Time

MANDATORY PRE-BID CONFERENCE:  10:00 A.M. local time, Tuesday, May, 15 2007 at the Pumpkin Creek Sewage Pumping Station located near the "Loves" gas station at the intersection of Interstate 65 and Bear Creek Pike (US 412/SR 99).  Contractors shall bring to this meeting pre-qualification information including similar work performed with references and evidence of the proper Tennessee Contracting License.


CONTRACT 2006-03 - Pumpkin Creek SPS Renovation 

  • Replacement of the pumps and controls with new pumps, controls, and variable frequency drives, installation of new surge relief valves, new check valves, and new piping.  The work also includes a new 250 KW diesel generator and auto transfer switch, rehabilitation of a manhole, renovation of a water tight door, a new metal roof, and all incidentals.

Project Manager: J. Greg Davenport, P.E.

Bid Advertisement  
Plan Holders 

Addendum No. 1 

Bid Results


Henderson Water Utility Henderson, Kentucky:  Water System Improvements
JRWCO Job No. 1861

Bid Date: Tuesday, April 24, 2007
Bid Time:  11:00 A.M., Local Time

CONTRACT 2006-04 - 8-inch Sebree/Webster County Interconnect Water Line

  • The work to be performed under Contract 2006-04 consists  of the installation of approximately 4,500 L.F. of 8-inch water line;
  • 160 L.F. of 8-inch R.J. DIP, 145 L.F. of 20-inch steel casing pipe, bored under U.S. Highway 41 and CSXT Railroad;
  • Meter pit including five gate valves, concrete vault, and piping;
  • Appurtenant materials asset out in these Detailed Specifications and shown on the plans.

Project Manager: J. Greg Davenport, P.E.

Bid Advertisement
Plan Holders 
Bid Results


Henderson Water Utility Henderson, Kentucky:  Water System Improvements
JRWCO Job No. 1868

Bid Date: Tuesday, April 24, 2007
Bid Time:  11:00 A.M., Local Time

CONTRACT 2006-02 - 18-inch Water Transmission Line

  • 5,050 L.F. of 18-inch Class 350 DIP Water Line
  • Four 18-inch Butterfly Valves
  • Five Connections to Existing Facilities
  • Three Fire Hydrant Assemblies

CONTRACT 2006-03 - Atkinson Park Water Booster Station

  • The work to be performed under Contract 2006-03 consists of the construction of a new built-in-place Water Booster Station complete with controls, miscellaneous piping and appurtenant work as set out in these Detailed Specifications and shown on the Plans. The Owner is purchasing the pumps and motors directly; the Contractor is required to install the pumps and motors.

Project Manager: J. Greg Davenport, P.E.

 

Bid Advertisement
Plan Holders 
Bid Results


Town of Livingston, Tennessee:  Water System Improvements
JRWCO Job No. 1831

Bid Date: Thursday, April 26, 2007
Bid Time:  2:00 P.M., CDT

MANDATORY PRE-BID CONFERENCE:  2:00 P.M. CDT, Thursday, April 19, 2007 at the Livingston City Hall

CONTRACT 2007-01 - Raw Water Transmission Line

  • Approximately 8,060 L.F. of20-inch Class 52 Ductile Iron Pipe
  • Approximately 150 L.F. Tunnel or Bore Through a Hillside
  • Approximately 140 L.F. Tunnel or Bore Under State Route 53
  • Five Creek Crossings

CONTRACT 2006-02 - Raw Water Transmission Line

  • Approximately 12,900 L.F. of 20-inch Class 52 Ductile Iron Pipe

Project Manager: J. Roy Wauford, Jr., P.E. 

Bid Advertisement 
Plan Holders 
Addendum No. 1 
Bid Results


City of Pulaski, Tennessee:  Sewer System Improvements
JRWCO Job No. 1840

Bid Date: Tuesday, April 3, 2007
Bid Time:  2:00 P.M., Local Time

MANDATORY PRE-BID CONFERENCE:  10:00 A.M. local time, Tuesday, March 27, 2007 at the Pulaski Wastewater Treatment Plant

CONTRACT 2006-01 - Wastewater Treatment Plant Improvements

  • Headworks Modifications including a new fine screen, new grit champers, diversion gates, and two parshall flumes
  • Two Multistage Centrifugal Grit Blowers and Building
  • Raising of the Aeration Basin walls along with installation of a new fine bubble aeration system
  • Three (3) Multistage Centrifugal Main Aeration Blowers
  • 100-foot diameter secondary Clarifier
  • Return and Waste Activated Sludge Pumping Station
  • Ultraviolet Disinfection System 
  • Conversion of the Existing Elevated Clarifier to a Gravity Thickener
  • Laboratory Building 
  • Site Piping and Excavation
  • SCADA System
  • Electrical Work
  • MANUFACTURERS OF MAJOR EQUIPMENT AS SET FORTH IN SECTION 10 SHALL SUBMIT PRE-BID DATA TO THE NASHVILLE OFFICE OF THE ENGINEER BY THE CLOSE OF BUSINESS THURSDAY, MARCH 22, 2007.  The Engineer will issue an addendum or addenda stipulating the status of the various equipment suppliers.

CONTRACT 2006-02 - Inflow Holding Basin

  • 5-acrea Earthen Lagoon
  • TDOT Class A-1 Rip-Rap Bottom and Outside Slope Protection
  • TDOT Class A-3 Rip-Rap Interior Slopes
  • 2,800 gpm return Flow Pumping Station
  • 2,400 L.F. of Security Fencing and Two 24-foot double gates
  • 330 L.F. of 24-inch DIP Gravity Sewer
  • 740 L.F. of 12-inch DIP Force Main

Project Manager: J. Greg Davenport, P.E.

Bid Advertisement Contract 2006-01
Bid Advertisement
Contract 2006-02
Plan Holders 
Contract 2006-01
Plan Holders 
Contract 2006-02
Addendum No. 1 

Addendum No. 2

Addendum No. 3

Bid Results


City of Lewisburg, Tennessee: Water and Sewer System Improvements
JRWCO Job No. 1877

Bid Date: Tuesday, March 6, 2007
Bid Time:  10:00 A.M., Local Time

CONTRACT 2006-02 - 8-inch Gravity Sewer Line to Serve Old Belfast Road (Complete in Place)

  • 3,936 L.F. of 8-inch Gravity Sewer Line
  • 17 Standard Manholes

CONTRACT 2006-03 - Rogers Road and Old Belfast Road 6-inch Water Line (Complete in Place)

  • 4,720 L.F. of 6-inch Water Line
  • 6 Fire Hydrants
  • 21 Water Service Reconnections

The City of Lewisburg is simultaneously accepting bids for the excavation only required on Contracts 2006-02 and 03.  In the event that the lowest Bid Price for Contracts 2006-02 and 2006-03 exceeds the project budgets, Bids for Contract 2006-02A and 2006-03A may be considered.

CONTRACT 2006-02A - Excavation required for the installation of the 8-inch gravity sewer lines (Identified in Contract 2006-02)

  • Excavation required for the installation of approximately 3,936 L.F. of 8-inch Gravity Sewer, 17 Standard Manholes, and all other appurtenances identified on the Plans and Specifications

CONTRACT 2006-03A - Excavation required for the installation of approximately 4,720 L.F. of 6-inch Water Line, 6 Fire Hydrants, Water Services, and all other appurtenances identified on the Plans and Specifications

  • Excavation required for the installation of approximately 4,720 L.F. of 6-inch Water Line, 6 Fire Hydrants, Water Services, and all other appurtenances identified on the Plans and Specifications

Project Manager: J. Greg Davenport, P.E.

Bid Advertisement  
Plan Holders

Addendum No. 1
 
Bid Results



 



BIDS FROM THE JACKSON OFFICE

 

City of Union City, Tennessee:  Water System Improvements
JRWCO Job No. 3523

Bid Date: Thursday, April 10, 2008
Bid Time:  2:00 P.M., local time


CONTRACT 08-01 - Painting Nailling Drive 500,000-Gallon Elevated Water Storage Tank

  • Cleaning interior of tank shell and center riser using blast cleaning methods, making necessary repairs and recoating the tank interior
  • Cleaning exterior of tank using blast cleaning methods, making necessary repairs and recoating the tank exterior

Project Manager:  Brian Marsh, E.I.

Bid Advertisement  
Planholders
  
Addendum No. 1
  
Addendum No. 2

 


Jackson Energy Authority, Jackson, Tennessee:  Wastewater System Improvements
JRWCO Job No. 3505

Bid Date:  Tuesday, April 8, 2008
Bid Time:  10:00 A.M., local time 
Mandatory Pre-Bid Meeting:  Tuesday, March 25, 2008 @ 2:00 P.M. at the Conference Room of the Miller Avenue Wastewater Treatment Plant


CONTRACT 4-08-2:  Middle Fork Wastewater Treatment Plant Expansion includes the following generally described work and all necessary appurtenances.

  • Site development, grading, miscellaneous concrete and paving.
  • Construction of one new concrete structure cyclical activated sludge reactor unit including a perforated membrane fine bubble aeration system.
  • Construction of one new concrete structure waste sludge pumping station including one vortex type waste sludge pump and a waste sludge metering and sampling system.
  • Construction of two new concrete structure aerobic sludge digester basins including a non-porous coarse bubble aeration system and two submersible type sludge transfer pumps.
  • Furnishing and installing of one cyclical activated sludge process blower and two aerobic digester blowers in the existing Blower Building.
  • Automated control and monitoring system additions and modifications.
  • Furnishing and installing various process monitoring instrumentation.
  • Furnishing and installing all piping, valves, manholes; and all ancillary materials and equipment for the above process units.
  • All electrical work.

Project Manager:  D. Ed Crowell, P.E.

Bid Advertisement  
Planholders
  

Addendum No. 1
  
Addendum No. 2
  
Bid Results

 


City of Clarksburg, Tennessee:  Wastewater System Improvements
JRWCO Job No. 3493
SRF Project No. 2007-199
CDBG Project No. GG-0722519-00

Bid Date: Thursday, April 3, 2008
Bid Time:  2:00 P.M., local time


CONTRACT 07-01 - Gravity Sewer Extensions Along State Route 22, State Route 424, Kirby Loop and Purdy Road

  • Installation of approximately 3,700 L.F. of 8-inch PVC Gravity Sewer Pipeline by excavation and backfill procedures.
  • Installation of approximately 220 L.F. of 8-inch Ductile Iron Gravity Sewer Pipeline inside an 18-inch steel casing pipe installed by boring and jacking.
  • Installation of approximately 3,900 L.F. of 1-1/4, 2 and 2-1/2-inch low pressure sewer force main.
  • Installation of 60 L.F. of 6-Inch Ductile Iron Gravity Sewer Pipeline inside a 14-inch steel casing pipe installed by boring and jacking.
  • Installation of approximately 1,300 L.F. of 4-inch Gravity Sewer Service Pipe.
  • Installation of 18 New Precast Concrete Manholes.
  • Installation of approximately 11 Low Pressure Sewer Grinder Pump Stations.

Project Manager:  D. Ed Crowell, P.E.

Bid Advertisement  
Planholders
  
Addendum No. 1
  
Bid Results


City of Union City, Tennessee:  Infrastructure Improvements
JRWCO Job No. 3519

Bid Date: Thursday, March 20, 2008
Bid Time:  10:00 A.M., local time


CONTRACT 07-01 - Priority Area 2 - Water Line Rehabilitation located between Exchange Street and High Street and between Ury Street and Clover Street includes the following approximate quantities and all necessary appurtenances:

  • Construction of approximately 5,200 L.F. of 6-inch size water pipelines, connecting these new pipelines to existing water pipelines, connection of existing services to the new pipelines and associated valves and fire hydrants.
  • Patching all streets, driveways, roadways, sidewalks, curbs and gutters and paved ditches damaged during construction activities.
  • Repair and establishment of vegetative cover on all earthen areas disturbed during construction activities.
  • All other activities indicated on the Bid Schedule.

Project Manager:  Brian Marsh, E.I.

Bid Advertisement
Planholders 
Addendum No. 1

 


City of Union City, Tennessee:  Infrastructure Improvements
JRWCO Job No. 3502

Bid Date: Thursday, March 15, 2007
Bid Time:  2:00 P.M., local time


CONTRACT 07-01 - Sewer System Rehabilitation Located between Exchange Street and High Street, and between Ury Street and Clover Street

  • 1,552 L.F. of existing6-inch gravity sewer line with 8-inch gravity sewer line using pipe bursting methods; replacement of approximately 2,484 L.F. of existing 8-inch gravity sewer line with 8-inch gravity sewer line using pipe bursting methods.
  • Renovation of approximately 2,193 L.F. of existing 8-inch gravity sewer line using cured-in-place pipe (CIPP) methods.
  • Replacement of approximately 89 sewer service connections and the associated sewer service pipe from the connection at the collector sewer to the customer's property line.

Project Manager:  D. E. Crowell, P.E.

Bid Advertisement  

 


 

BIDS FROM THE MARYVILLE OFFICE


Bon Aqua-Lyles Utility District:  Water System Improvements
JRWCO Job No. 4563
SRF Project No. 2006-071

Bid Date: Thursday, December 6, 2007
Bid Time:  2:00 P.M., local time

CONTRACT 07-02 - Water Transmission Lines & Appurtenances

  • The work to be performed under Contract 07-02 consists of the construction of approximately 7,790 L.F. of twelve (12) inch and 14,615 L.F. of sixteen (16) inch water transmission lines  and appurtenances, as described in the Detailed Specifications and as shown on the Plans.

CONTRACT 07-03 - Highway 46 Booster Station & Appurtenances

  • The work to be performed under Contract 07-03 consists of the construction of the Highway 46 Booster Station and Appurtenances, complete in place, including installation of an above-ground factory-built (packaged) booster station equipped with two (2) nine hundred (900) gallon per minute pumps and motors, pump control panels, piping, electrical work, site development  and appurtenant work as described in the Detailed Specifications and as shown on the Plans.

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement 
Plan Holders
 
Addendum No. 1
  
Addendum No. 2
 
Bid Results 


Town of Rogersville, Tennessee:  Water System Improvements
JRWCO Job No. 4522
CDBG Project No. GG-07-21893-00
SRF Project No. 2005-064

Bid Date: Thursday, October 25, 2007
Bid Time:  2:00 P.M., local time

CONTRACT 07-01 - Stanley Valley Road Water Lines and Appurtenances - Phase IV

  • The work to be performed under Contract 07-01 consists of the construction of approximately 2,070 L.F. of two (2) inch, 1,700 L.F. of four (4) inch and 24,430 L.F. of six (6) inch water lines and appurtenances, as described in the Detailed Specifications and as shown on the Plans.
  • See Bid Ad for Alternate Bid

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement 
Plan Holders
  
Bid Results


Shelbyville Power, Water & Sewerage System: Sanitary Sewer System Improvements
JRWCO Job No. 4501

No Federal Funds Involved

Bid Date: Tuesday, June 5, 2007
Bid Time:  2:00 P.M., local time

CONTRACT 07-01 - Biosolids Building & Appurtenances

  • The work to be performed under Contract 07-01 consists of the construction of a Biosolids Building, complete with two (2) rotary coil presses, a polymer feed system, two (2) sludge pumps, metering and control equipment, electrical work, yard piping modifications and improvements, and site grading and development, as set out in these Detailed Specifications and shown on the Plans.

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders

Addendum No 1
Bid Results


Town of Decatur, Tennessee:  Water  System Improvements
JRWCO Job No. 4446
EPA Project No.XP964209-05

Bid Date: Tuesday, May 1, 2007
Bid Time:  2:00 P.M., local time

CONTRACT 05-01 - River Road Water Line Upgrades

  • 4,815 L.F. of 6-inch Water Lines

CONTRACT 05-02 - Municipal Water Supply Well No. 2, Building & Raw Water Line

  • Installation and development of Municipal Water Supply Well No. 2 and the construction of a building to house the new well and approximately 85 L.F. of six (6) inch raw water line, complete in place.

CONTRACT 05-03 - Painting of Existing Knox Ridge High Pressure Zone Ground Level                                              Water Storage Tank

  • Cleaning, Repairing, and painting of the existing 500,000 gallon Knox Ridge High Pressure Zone Ground Level Water Storage Tank

 

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders

Addendum No 1

Addendum No 2

Bid Results


City of Morristown, Tennessee:  Sanitary Sewer System Improvements
JRWCO Job No. 4541

REVISED Bid Date: Thursday, February 15, 2007
Bid Time:  2:00 P.M., local time

CONTRACT 05-01 - North Haun Road/Fulton Road/Bell Road Area Sewer Extensions

  • 8,827 L.F. of 8-inch Gravity Sewers

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders

Addendum No 1

Bid Results


 


AWARDED CONTRACTS


City of Bristol, Tennessee: Water Works Improvements
JRWCO Job No. 4577

Bid Date: Tuesday, January 9, 2007
Bid Time:  2:00 P.M., local time

CONTRACT 06-03 

  • The work to be performed under Contract 06-03 consists of cleaning, repairing and painting the interior of the existing 750,000 gallon Redstone Ground Level Water Storage Tank

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders

Addendum No 1

Bid Results


Town of Englewood, Tennessee:  Sanitary Sewer System Improvements
JRWCO Job No. 4537
CDBG No. GG-06-12373-00
SRF Project No. 2006-188

Bid Date: Tuesday, December 5, 2006
Bid Time:  2:00 P.M., local time

CONTRACT 06-01 - Wastewater Treatment Plant Improvements

  • The work to be performed under Contract 06-01 consists of the construction of replacement of the existing comminutor with a channel electric grinder unit, replacement of two (2) influent centrifugal raw wastewater pumps and a waste sludge pump, a new 42,000 gallon aerobic digester, two (2) new positive displacement blowers, a new twenty (20) cubic yard sludge box and accessories, installation of sulfonator equipment, electrical work, yard piping modifications and improvements, and site grading and development, as set out in these Detailed Specifications and as shown on the plans.  AN ALTERNATE BID WILL BE RECEIVED FOR THE DEDUCTION OF THE WASTE SLUDGE PUMP REPLACEMENT, INCLUDING THE ASSOCIATED ELECTRICAL WORK.

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders
Bid Results


 

City of Niota, Tennessee:  Water System Improvements
JRWCO Job No. 4536

Bid Date: Tuesday, November 14, 2006
Bid Time:  2:00 P.M., local time

CONTRACT 06-01 - Lakewood Community Water Lines & Appurtenances

The work to be performed under Contract 06-01 consists of the construction of approximately 5,175 L.F. of four (4) inch and 32,630 L.F. of six (6) inch water lines and appurtenances as described in these Detailed Specifications and shown on the Plans.

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders

Bid Results


City of Bristol, Tennessee:  Water System Improvements
JRWCO Job No. 4573

Bid Date: Thursday, November 9, 2006
Bid Time:  1:00 P.M., local time

CONTRACT 06-02 - Collingwood Subdivision Water Line Replacements

  • 6,175 L.F. of six (6) inch water lines and appurtenances
  • 5,675 L.F. of eight (8) inch water lines and appurtenances

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders
Bid Results


Town of Rogersville, Tennessee:  Water System Improvements
JRWCO Job No. 4522

Bid Date: Thursday, November 16, 2006
Bid Time:  2:00 P.M., local time

CONTRACT 06-04 - Stanley Valley Road Water Lines and Appurtenances - Phase III

  • 1,970 L.F. of two (2) inch, 5,970 L.F. of four (4) inch, 40,180 L.F. of six (6) inch and 3,140 L.F. of eight (8) inch water lines and appurtenances, as described in the Detailed Specifications and as shown on the Plans.
  • See Bid Ad for Alternate Bid

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders
Addendum No. 1  - Contact Maryville Office at 865-984-9638
Addendum No. 2  - Contact Maryville Office at 865-984-9638
Bid Results


Town of Rogersville, Tennessee:  Water System Improvements
JRWCO Job No. 4522

Bid Date: Thursday, November 16, 2006
Bid Time:  2:00 P.M., local time

CONTRACT 06-01 - Water Transmission Lines & Appurtenances

  • 13,810 L.F. of 8-inch Water Transmission Lines
  • 14,715 L.F. of 12-inch Water Transmission Lines

CONTRACT 06-02 - Stanley Valley Road Booster Station & Telemetry System Improvements

  • Installation of two (2) one hundred eighty (180) gallon per minute pumps and motors, pre-cast concrete vault, pump control panel, piping, electrical work, site development, and all appurtenant work.  Telemetry System Improvements consists of installation of telemetry equipment at the proposed 200,000 gallon Mount Zion Road Ground Level Water Storage Tank, the proposed Stanley Valley Road Booster Station, and modifications to the existing telemetry equipment at the Water Treatment Plant.

CONTRACT 06-03 - 200,000 Gallon Mount Zion Road Ground Level Water Storage Tank & Foundation, Site Development & Access Road

  • The work to be performed under Contract 06-3 consists of the construction of a 200,000 gallon prestressed concrete or welded steel ground level water storage tank and foundation, site development, and access road as specified in the specifications and as shown on the plans.

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders
Addendum No. 1 
- Contact Maryville Office at 865-984-9638
Addendum No. 2  - Contact Maryville Office at 865-984-9638
Addendum No. 3

Bid Results


City of Elizabethton, Tennessee:  Water System Improvements
JRWCO Job No. 4529

Bid Date: Tuesday, August 8, 2006
Bid Time:  2:00 P.M., local time

CONTRACT 06-01 - Water Lines & Appurtenances

  • 11,180 L.F. of 6-inch Water Lines

Project Manager:  Joseph R. Wauford, III, P.E.

Bid Advertisement  
Plan Holders


Henderson Water Utility Henderson, Kentucky:  Water System Improvements
JRWCO Job No. 1868

Bid Date: Thursday, March 1, 2007
Bid Time:  10:00 A.M., Local Time

MANDATORY PRE-BID CONFERENCE:  10:00 A.m. local time, Thursday, February 22, 2007 at the Administrative Office of the Henderson Water Utility

CONTRACT 2006-01 - Painting and Renovation of the 4.5 MG Atkinson Park Water Storage Tank

  • Cleaning the tank interior and exterior using blast cleaning methods, making certain repairs, recoating the tank interior and exterior, and regrading the tank site.

Project Manager: J. Greg Davenport, P.E.

 

Bid Advertisement
Planholders 

PRE-QUALIFIED CONTRACTORS

Addendum No. 1 


City of Columbia, Tennessee:  Sewer System Improvements
JRWCO Job No. 1813

Bid Date: Tuesday, August 22, 2006
Bid Time:  10:00 A.M., Local Time

CONTRACT 2005-03 - Site Work and Installation of Diesel Generators at the WWTP and G.E. SPS 

  • Site work and installation of a 1,750 KW diesel generator and auto transfer switch system supplied by the Owner at the Wastewater Treatment Plant including all other appurtenances as shown in the Plans and specified.
  • Site work and installation of a 600 KW diesel generator and auto transfer switch system supplied by the Owner at the G.E. sewage pumping station including the installation of the wiring between the auto transfer switch and generator, auto transfer switch stand, and all other appurtenances as shown in the Plans and specified.

Project Manager: J. Greg Davenport, P.E.

Bid Advertisement
Planholders
  
Addendum No. 1
   
Bid Results




Back To The Top